国产视频亚洲一区|奇米四色av|在线看片网站,久久久久久9999,日本偷拍一区二区三区,青涩校花被蹂躏h文

Smart Transportation

Expressway Smart Transportation Solution

Overview:

      It aims to provide intelligent system for expressway network monitoring, communication, no-stop toll collection system and expressway & tunnel. The scope of work include system design, equipment supply, shipment, installation, commissioning, opening, trial, training, data, delivery, warranty, spare parts and other work items. It will build up a desirable and reliable system. The traffic monitoring consists of subsystems of computer, traffic, CCTV surveillance, traffic event detection, cable broadcasting and a public streaming distribution.

Overall Objective:

In order to ensure the traffic safety after the opening and operation of the expressway, the high-speed electromechanical system includes three major systems: namely the communication system, toll collection system and monitoring system. Since the system was built and put into operation, the system has been running well and stably, providing great help for expressway operation and management.

Solution:

1. Improve the traffic capacity and traffic operation efficiency. Benefits mainly include: (1) Increasing the total mileage of vehicle trips on the expressway; (2) Accelerating the travel and cutting the time; (3) Cutting the time delay and traffic accident response time; (4) Decreasing car stop times; (5) Increase the vehicle occupancy rate and the predictability of travel time. 
        2. Improve the traffic safety. Benefits mainly include: (1) Reducing traffic accidents and casualties; (2) Decreasing the occurrence of secondary accidents; (3) Cutting the economic losses caused by accidents; (4) Accelerating the recovery of traffic accidents; (5) Lessening the fatigue of drivers and passengers.   
     3. Reduce traffic energy consumption and pollution. Benefits mainly include: (1) Improving the use efficiency of automobile fuel and reducing the consumption time of fuel; (2) Reducing the pollution of automobile exhaust and noise to the environment. 
   4. Improve the transportation production capacity. Benefits mainly include: (1) Increasing driving speed to bring economic benefits to transportation enterprises and transportation services, increase passenger and freight volume and reduce transportation cost; (2) Improving the timeliness of arrival and delivery to attract new customers. 
   5. Intensify the comfort and convenience of travel. Benefits mainly include: (1) Reducing the fatigue of drivers and passengers by making the driving more comfortable; (2) Facilitating travelers to arrange travel plans in advance. 
   6. Accelerate the speed of fund recovery. Benefits mainly include: (1) Increasing the traffic capacity and profit, and speed up the fund recovery; (2) Preventing cheating induced missed toll collection and missed payment.

Typical Cases:

East Section of Chengdu Second Ring Expressway Project
Transportation Bureau of Handan City Highway Project
Nanjing Yangtze River Fourth Bridge Project
Guangxi Lingfeng-Babu Highway Project


Zhejiang Zhuyong Expressway Construction Project



企業成員

ADD:No.10 Maqun Avenue, Qixia District, Nanjing, Jiangsu Province, China   
TEL:025-84356666   FAX:025-84356677 | Mail:[email protected]
[email protected] 025-84356666
主站蜘蛛池模板: 盐亭县| 沧州市| 娱乐| 五原县| 雅江县| 新营市| 盐池县| 凤冈县| 凯里市| 双江| 福建省| 奇台县| 雷波县| 正镶白旗| 孝感市| 金山区| 龙山县| 婺源县| 漳浦县| 冷水江市| 彩票| 富顺县| 麻阳| 阳城县| 叶城县| 克什克腾旗| 三河市| 桃源县| 黎川县| 壤塘县| 宜阳县| 新邵县| 诸城市| 浏阳市| 巴楚县| 福清市| 申扎县| 泗水县| 绥阳县| 石柱| 瓦房店市|